708.403.1812 [email protected]

Project

Pure Barre

Elmhurst, IL

Project Info

This fitness center was located on the ground floor of a retail strip mall sandwiched between a high-end restaurant and a clothing store. Because of the volume generated by the sound system used during a typical Pure Barre workout session, sound isolation was key to the success of this facility. The resultant design utilized perimeter isolation construction with an STC of 60. Ceiling sound isolation from the tenants above was also required. To address this need, construction providing an STC in excess of 46 was created overhead.

Let's Build Something